Colocation requirements checklist for enterprise buyers
Colocation requirements checklist. enterprisecolocation.com. Updated November 2026.
This colocation requirements checklist covers what an enterprise should pin down, and what each provider should prove in writing, before a shortlist goes to security and procurement: power, cooling, density, redundancy, carriers and cloud access, physical security, compliance evidence, remote hands, growth room, contract basics and timeline. There are 49 items in ten groups. Copy the tables, download them as a CSV, or print them.
Every line has two halves. The first is the requirement you set before you contact anyone. The second is the question and the document that show whether a provider meets it. A "yes" with no document behind it stays open.
This site is built for deployments of several racks and up. If you need space for one or two servers, much of this list will be more than you need.
Want it written up for your setup? The Enterprise Requirements Builder, at the top of our home page, takes eight answers and turns them into a requirements document, with the security and procurement questions that apply to your compliance needs. This page is the long reference list. The builder trims it to what fits you.
How to use this colocation checklist
- Fill in your side first. Put your numbers and needs in the "Our requirement" column before any provider call or email. Providers answer the question you ask, so ask with your figures attached.
- Send every provider the same list. Remove internal notes, keep the questions and the evidence column, and ask for written answers with the documents attached.
- Mark what came back. Tick an item only when the evidence arrived and matches your requirement. Anything answered in a sentence and nothing else is still open.
- Hand the open items to the right owner. Power, cooling and network go to infrastructure. Security and compliance go to your security team. Terms, renewal and exit go to procurement and counsel.
Power and density requirements
Set the load and the density first. Every other answer depends on them.
| Check | ID | Requirement to set | Ask the provider | Evidence to request | Provider answer |
|---|---|---|---|---|---|
| P1 | Critical IT load in kW, today and three years out | How much power is available to us in this specific hall or suite today, and how much more is committed for later? | A written capacity statement for the named hall or suite, with dates | ||
| P2 | Average and peak kW per cabinet | What density per cabinet does this room support with its standard cooling? | Room design specification | ||
| P3 | Circuit type, voltage and size, with A and B feeds | Which circuit types and sizes can you deliver to our cabinets, and is each feed from a separate path? | Circuit options list and the power path for our space | ||
| P4 | Usable load per circuit | What share of a breaker's rating can we draw before the power SLA stops applying? | The SLA clause that sets the load limit | ||
| P5 | Power billing model | Is power billed per circuit reserved or per kWh used, and how is the rate set and changed? | Rate schedule and a sample invoice | ||
| P6 | Generator runtime and fuel | How many hours of fuel are stored on site, and what refueling contracts back it? | Fuel contract summary and the date of the last generator load test | ||
| P7 | Redundancy from utility to cabinet (N+1, 2N) | What is the redundancy at each stage: utility feeds, UPS, generators, distribution and cabinet PDUs? | One-line electrical diagram for our space |
Cooling requirements
Cooling caps the density you can run, so check it against the peak figure in P2, not the average.
| Check | ID | Requirement to set | Ask the provider | Evidence to request | Provider answer |
|---|---|---|---|---|---|
| C1 | Cooling method (air, rear-door heat exchanger, direct liquid) | Which cooling methods can this room deliver today, and at what density each? | Cooling design summary for the room | ||
| C2 | Temperature and humidity range | What temperature and humidity does the SLA commit to, and where is it measured? | The SLA environmental clause | ||
| C3 | Containment | Who supplies, installs and pays for hot or cold aisle containment? | Order form line item or written policy | ||
| C4 | Liquid cooling for AI or high-density racks | Is liquid cooling live in this building now, or planned? If planned, by what date? | Written date and the facility water and cooling spec |
Redundancy and resilience requirements
Ask for the documents behind any redundancy claim. A rating in a brochure is a claim, not evidence.
| Check | ID | Requirement to set | Ask the provider | Evidence to request | Provider answer |
|---|---|---|---|---|---|
| R1 | Target tier or topology | Is the Tier rating an Uptime Institute certification or your own description of the design? | The certificate, showing the facility it covers | ||
| R2 | Maintenance without downtime | Can planned maintenance happen without taking either of our feeds down? How much notice do we get? | Maintenance and change notice policy | ||
| R3 | Incident history | What incidents in the past three years affected customer power, cooling or network, and what changed after each? | Incident summaries, often shared under NDA | ||
| R4 | Site hazards | Is the building in a mapped flood zone, and what other local hazards does your risk review list? | Flood zone lookup and the provider's site risk summary | ||
| R5 | Second site, if any | For a DR or active-active pair, how far apart are the sites and do they rely on separate utility substations? | Utility feed details for both sites |
Network, carrier and cloud requirements
Count carriers that are on-net in the building itself. A carrier reached over a fabric from another site is a different answer.
| Check | ID | Requirement to set | Ask the provider | Evidence to request | Provider answer |
|---|---|---|---|---|---|
| N1 | Number of on-net carriers needed | Which carriers are on-net in this building today, as opposed to reachable through another site? | Current on-net carrier list for the building | ||
| N2 | Diverse fiber entry | How many fiber entrances does the building have, and are they physically separated? | Site plan showing entry points | ||
| N3 | Cloud on-ramps (AWS, Azure, Google Cloud, Oracle) | Is each on-ramp we need native in this building, or reached over a fabric to another location? | On-ramp list by building | ||
| N4 | Internet exchange access | Which internet exchanges can we connect to from this building? | Exchange list and port pricing | ||
| N5 | Cross-connect pricing | What are the one-time and monthly fees per cross-connect, by type, and can they be fixed for the term? | Price schedule attached to the order form |
Physical security requirements
Your security team will want each of these in writing before a tour is worth anyone's time.
| Check | ID | Requirement to set | Ask the provider | Evidence to request | Provider answer |
|---|---|---|---|---|---|
| S1 | Access layers to our space | How many controlled layers sit between the street and our cabinet or cage, and how is each one checked? | Security policy and a floor plan of the layers | ||
| S2 | Access list control | Who can add names to our access list, and how fast is a removal processed? | Access request and removal procedure | ||
| S3 | Log and camera retention | How long are badge logs and camera footage kept, and how do we request them? | Retention policy and a sample access report | ||
| S4 | Cabinet and cage locks | Are locks keyed, coded or biometric, and who holds spare keys or codes? | Lock specification | ||
| S5 | Deliveries and chain of custody | How are deliveries received, logged, stored and released to our staff? | Shipping and receiving procedure | ||
| S6 | Media destruction | Can drives be destroyed on site, and do we get a certificate for each job? | Service description and a sample certificate |
Compliance evidence: SOC 2, ISO 27001, HIPAA, PCI DSS
The facility's reports cover the facility's controls. Your own systems stay your job, and your auditor or counsel confirms what you need.
| Check | ID | Requirement to set | Ask the provider | Evidence to request | Provider answer |
|---|---|---|---|---|---|
| K1 | SOC 2 Type II | Do you have a current SOC 2 Type II report that covers this facility? What period does it cover, and will you share it under NDA? | The full report, plus a bridge letter if the period has ended | ||
| K2 | ISO/IEC 27001 | Does the certificate's scope include this building? | Certificate and scope statement | ||
| K3 | HIPAA | If our counsel decides we need one, will you sign a business associate agreement? | The provider's standard BAA | ||
| K4 | PCI DSS | Is there a PCI DSS attestation that covers physical security at this site? | Attestation of Compliance | ||
| K5 | FedRAMP or government work | What evidence can you give for the physical and environmental controls our authorization package needs? | Control descriptions and the related audit evidence | ||
| K6 | Shared responsibility | Which controls do you own, and which stay with us? | A written responsibility matrix |
Support and remote hands
Remote hands is where small monthly charges add up. Get the rate card before you sign.
| Check | ID | Requirement to set | Ask the provider | Evidence to request | Provider answer |
|---|---|---|---|---|---|
| H1 | On-site staff | Is remote hands staffed on site around the clock, or on call after hours? | Staffing schedule for the facility | ||
| H2 | Remote hands rates | What is the hourly rate in business hours and off hours, the billing increment and any minimum? | Current rate card | ||
| H3 | Response time | What response time is committed in writing for remote hands tickets? | The SLA or service description clause | ||
| H4 | Scope of included work | Which tasks are included and which are quoted separately as advanced or smart hands work? | Service description listing tasks | ||
| H5 | Ticketing and reporting | How do we open tickets, and what reporting do we get on power use and access? | Portal demo or sample reports |
Growth room
Growth room is cheapest to secure before signing, while the provider still wants the deal.
| Check | ID | Requirement to set | Ask the provider | Evidence to request | Provider answer |
|---|---|---|---|---|---|
| G1 | Adjacent space | Can space next to ours be held for us, for how long and at what cost? | Reservation or right of first refusal clause | ||
| G2 | More power in the same space | Can we add power to our existing cabinets or suite without moving? | Written answer with the limit per cabinet | ||
| G3 | Campus or second building | If this building fills, where would our next phase go? | Campus plan and expected delivery dates |
Contract and commercial items
These four set the shape of the deal. The full list of terms is on our contract terms page.
| Check | ID | Requirement to set | Ask the provider | Evidence to request | Provider answer |
|---|---|---|---|---|---|
| T1 | Preferred term length | Which term lengths do you offer, and how does pricing change with each? | Pricing by term | ||
| T2 | Price escalator | Is the annual increase fixed or index-linked, and what is the cap? | Escalator clause | ||
| T3 | Renewal and notice | Does the contract renew automatically, and how much notice is needed to change or end it? | Renewal clause | ||
| T4 | Exit and removal | How long do we have to remove equipment at the end, and what holdover fees apply? | Termination and removal clause |
Timeline requirements
Work back from the live date and the notice deadline on your current contract, whichever comes first.
| Check | ID | Requirement to set | Ask the provider | Evidence to request | Provider answer |
|---|---|---|---|---|---|
| L1 | Target live date | Can you commit to a ready-for-service date in writing? | Ready-for-service clause with the date | ||
| L2 | Current contract end and notice deadline | (Internal) When does our current contract end, and when is the last day to give notice? | Our existing contract | ||
| L3 | Remedy for a late handover | What happens if our space is not ready on the committed date? | Credit or termination right for a missed date | ||
| L4 | Move-in support | Is there a loading dock, staging space and a move window we can book? | Move-in procedure |
What this data center requirements checklist leaves out
A list this broad stops short of three things, on purpose:
- Your own controls. A facility's SOC 2 or PCI evidence covers the building and the provider's staff. Your servers, your access rules and how you handle data stay with you, and your auditor confirms the split.
- Pricing. Prices depend on market, size, term and timing. Ask each provider for a priced order form against the same requirements, so the numbers line up.
- Legal review. The contract items above are prompts for your procurement team. Your counsel confirms the final language. Our contract terms page goes through each term in more detail.
Print or download the colocation checklist
The CSV works in Excel, Google Sheets and Numbers, with one row per item and blank columns for your requirement and three providers' answers. The print version gives you the same tables with tick boxes, ready to save as a PDF and attach to an email.
Data center selection criteria that work as pass or fail filters
Some criteria aren't worth scoring, because a facility that misses them is out. Apply these before you compare providers line by line, so you only spend time on facilities that could win:
- Market and distance. Inside the metro or latency radius your applications need, and far enough from your other site if this is a DR pair.
- Power by your date. Enough capacity for your load in a named hall by your live date, with a written date.
- Density. Supports your peak kW per cabinet with the cooling available today.
- Compliance reports in hand. The reports or certificates your auditor requires exist now and cover this building. "In progress" is a fail unless your timeline allows for it.
- Carrier minimum. At least the number of on-net carriers your network team requires.
- Term match. The provider offers a term length within your approved range.
Questions about this checklist
What should a colocation requirements checklist include?
At minimum: power and density, cooling, redundancy, carriers and cloud access, physical security, compliance evidence, remote hands, growth room, the main contract terms and a timeline. For each item, set your requirement and name the document a provider must send to prove it.
Who on our team should fill it in?
Infrastructure owns power, cooling, density and network. Security owns access control, logs and compliance evidence. Procurement owns term, escalators, renewal and exit, with counsel reviewing the language. One person should collect the answers so every provider is judged on the same sheet.
Can we send this checklist straight to providers?
Yes, once your requirement column is filled in and internal notes are removed. Send the same version to every provider and ask for written answers with documents attached, so the replies can be compared line by line.
What counts as evidence?
A document that names the facility: a SOC 2 Type II report covering the building, an ISO 27001 certificate whose scope includes it, a one-line electrical diagram, a current carrier list, a rate card, a contract clause. A sales email or a brochure line is a claim, not evidence.
How is this different from the Enterprise Requirements Builder?
This page is the full reference list. The builder on our home page asks eight questions about your project and writes a requirements document for your setup, with the security and procurement questions that match your compliance needs.
Our deployment is one or two racks. Does this apply?
Parts of it do, such as power, carriers and access control. This site is built for larger deployments, and much of the list will be more than a one or two rack move needs.